Term
| IF A CI DOES NOT EXIST, WHAT DO YOU SUBMIT TO WHO? |
|
Definition
|
1. AN ENGINEERING CHANGE REQUEST
2. UNIT SYSTEM ADMINISTRATOR
|
|
|
Term
| A MAINTENANCE PROCEDURE SELECTION SCREEN IS DISPLAYED LISTING ALL MAINTENANCE PROCEDURES IN WHAT ORDER? |
|
Definition
|
|
Term
| WHEN CREATING LOCAL MAINTENANCE PROCEDURE, WHAT ARE MENU CHOICES? |
|
Definition
|
MAINTENANCE, PROCEDURE, LOCAL
|
|
|
Term
| TRUE OR FALSE:
CONDITIONAL ARE NOT AUTOMATICALLY, ADDED TO THE SCHEDULE BECAUSE THEY ARE NOT DUE UNTIL A CERTAIN CONDITION IS ATTAINED. |
|
Definition
|
|
Term
| IF THE LOCAL MAINTENANCE PROCEDURES ARE UPDATED, WHERE IS IT MANDATORY FOR YOU TO APPLY THESE CHANGES? |
|
Definition
|
YOU HAVE TO APPLY IT TO THE MASTER TASKS.
|
|
|
Term
| INITIALIZING THE MASTER TASK WILL ACTIVATE THE MAINTENANCE TASK, WHICH WILL BE PUT IN THE MAINTENANCE SCHEDULER AND WHAT ELSE WILL HAPPEN? |
|
Definition
|
IT WILL ALSO LINK THE MASTER TASK TO THE MAINTENANCE PROCEDURE.
|
|
|
Term
| WHAT DO YOU DO TO EQUIPMENT PRIOR TO REPAIR? |
|
Definition
|
|
Term
| SECURE POWER EITHER BY MAIN BATTERY PANEL SWITCH OR ? |
|
Definition
|
DISCONNECT THE BATTERIES NEGATIVE TERMINAL.
|
|
|
Term
| WHEN WORKING ON EXPOSED ELECTRICAL EQUIPMENT, USE __________ TOOLS. |
|
Definition
|
INSULATED AND A NON-METALLICA FLASHLIGHT.
|
|
|
Term
| PROBABLE CAUSE OF LOW COMPRESSION IN ALL CYLINDERS IS? |
|
Definition
|
PISTON RINGS AND CYLINDER ARE WORN.
|
|
|
Term
| WHAT SHOULD YOU DO WITH A DAMAGED PROPELLAR? |
|
Definition
|
|
Term
| WHAT SHOULD YOU DO TO PREVENT ACCIDENTAL STARTING OF THE ENGINE DURING PROPELLAR REPLACEMENT? |
|
Definition
|
REMOVE ALL SPARK PLUGS LEADS
|
|
|
Term
| REGARDLESS OF THE SIZE OF THE UNIT, THE OPERATING RECORDS, LOGS, ACCOUNTS, ETC., FOUND WITHIN THE ENGINEERING DEPARTMENT IS IMPORTANT TO THE EFFICIENT OPERATION AND ______________? |
|
Definition
|
|
Term
| WHAT IS AN AUTOMATIC CONTINUOUS RECORDING OF ALL THE MEASURED VALVES OF THE ENGINE? |
|
Definition
|
|
Term
| THE PILOT VALVE PLUNGER MOVES UP AND DOWN IN THE ROTATING PILOT VALVE BUSHING TO CONTROL THE FLOW OF OIL TO OR FROM WHAT? |
|
Definition
|
|
Term
| ADJUST THE RACKS OF ALL OTHER PUMPS TO "_" POSITION USING THE ADJUSTING SCREW "_" ON THE CONTROL RACK. |
|
Definition
|
|
Term
| GOVERNOR-FUEL INJECTION PUMP DISCONNECTS THE GOVERNOR LINKAGE AND TRIPS THE WHAT? |
|
Definition
|
|
Term
| WHAT INVOLVES ADJUSTING INJECTOR PLUNGER TRAVEL WITH AN ACCURATE DIAL INDICATOR WHILE THE TORQUE METHOD INVOLVES TIGHTENING THE ADJUSTING SCREW TO A SPECIFIED TORQUE? |
|
Definition
|
|
Term
| INJECTORS AND VALVES TIGHTEN THE HOLDDOWN CAPSCREW TO WHAT TORQUE? |
|
Definition
|
|
Term
| WHAT RPM RANGE DO PROPELLARS WORK? |
|
Definition
|
|
Term
| HOW ARE THE PROPULSION UNITS ON MOST GEAR-DRIVEN, MULTIPLE-PROPELLAR SHIPS SET UP? |
|
Definition
|
THEY ARE INDEPENDANT OF EACH OTHER
|
|
|
Term
| THE FUNCTION OF WHAT IS TO REDUCE THE PROPELLAR RPM WHILE PERMITTING THE HIGH ENGINE RPM REQUIRED FOR OPERATION OF ENGINE ACCESSORIES? |
|
Definition
|
|
Term
| PROPULSION UNITS ARE ALSO KNOWN AS WHAT? |
|
Definition
|
|
Term
| RUDDER BEARING TOLERANCE READINGS ARE TAKEN EVERY YEAR AS PART OF WHAT? |
|
Definition
|
|
Term
| WHERE DO YOU TAKE FEELER GUAGE READINGS FOR BOTH PORT AND STBD RUDDERS? |
|
Definition
|
AT FOUR POSITIONS AROUND THE SHAFT
|
|
|
Term
| WHAT IS THE MAXIMUM DIAMETRIC BEARING CLEARANCE ALLOWED FOR A 3IN RUDDER SHAFT? |
|
Definition
|
|
Term
| POTABLE WATER IS PRODUCED ABOARD SHIP BY TREATING DESALIENATED SEAWATER OR WATER RECEIVED FROM SHORE FACILITIES WITH WHAT TYPE OF DISINFECTANT? |
|
Definition
|
|
Term
| WHAT DO YOU WEAR FOR EMERGENCY SITUATIONS WHERE THE EXPOSURE LEVELS ARE NOT KNOWN? |
|
Definition
|
A FULL-FACE POSITIVE-PRESSURE, AIR SUPPLIED RESPIRATOR FOR BROMINE.
|
|
|
Term
| WHAT ARE SAFETY REQUIRMENTS FOR CHLORINE, WHERE EXPOSURE TO DUST OR MIST IS APPARTENT? |
|
Definition
|
A HALF FACE DUST/MIST RESPIRATOR MAY BE WORN
|
|
|
Term
| THE AMOUNT OF CHLORINE OR BROMINE REQUIRED FOR PRODUCTION OF FAC OR TBR RESIDUAL OF .2 PPM CAN VARY WIDELY BECAUSE OF WHAT? |
|
Definition
|
|
Term
| WHAT DO YOU DO IF THE AMOUNT OF BROMINE EXCEEDS THE ACCEPTABLE LEVEL? |
|
Definition
|
DILUTE THE POTABLE WATER TANK WITH FRESH WATER.
|
|
|
Term
| FOR TOTAL, CHLORINE, PLACE THE PREPARED SAMPLE IN THE CELL HOLDER AND COVER WITH INSTRUMENT CAP. HOW LONG DO YOU HAVE TO WAIT ? |
|
Definition
|
WAIT 3-6 MINUTES AFTER ADDING THE DPD TOTAL PILLOWS.
|
|
|
Term
| WHERE ARE THE AUTOMATIC PROPORTIONING BROMINATORS INSTALLED ? |
|
Definition
|
THEY ARE INSTALLED IN THE DISTILLATE DISCHARGE LINE.
|
|
|
Term
| WHY IS THE CHLORINE DISINFECTION METHOD CONSIDERED THE LEAST DESIRABLE? |
|
Definition
|
BECAUSE IT CAN OVERCHLORINATE THE SYSTEM
|
|
|
Term
| ____________ _____ _______________
ARE POSITIVE DISPLACEMENT MODELS, WHICH MEANS THE COMPRESSOR TAKES IN SUCCESSIVE VOLUMES OF AIR THAT IS CONFINED WITHIN A CLOSED SPACE AND ELEVATES THIS AIR TO A HIGHER PRESSURE. |
|
Definition
|
RECIPROCATING AIR COMPRESSORS
|
|
|
Term
| WHAT ACTS AS A MUFFLER BY REDUCING THE SOUND LEVEL LEAVING THE STARTER MOTOR? |
|
Definition
|
|
Term
| NORMALLY WHAT DOES EACH AIR BANK HAVE A MINIMUM CAPACITY FOR? |
|
Definition
|
ONE COLD START AND NINE HOT STARTS WITH RECHARGING
|
|
|
Term
| THE DISCHARGE FROM A PRESSURE REDUCING STATION IS PROVIDED WITH A WHAT? |
|
Definition
|
|