| Term 
 
        | IOP-3   Hot Standby to Min Load |  | Definition 
 
        | Purpose: To provide Instuctions for Start up from Mode 3 to Mode 1(Power Operation) |  | 
        |  | 
        
        | Term 
 
        | When Should Criticality Be Anticipated? |  | Definition 
 
        | Any Time Rods are being Withdrawn or Dilution of Boron. ie. Positive reactivity.   Only one type of positive reactivity at a time is to be made   SUR Limit is <= .4 dpm Post refuel 1dpm for all other criticalitiies |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | Inverse Count Rate Ratio or 1 over M Plot.   Predicts the point of criticality based on Estimated Critical Conditions (ECC) 1. > 300pcm <400... Eval by R.E. Reactor Pwr Cont. 2. >400 <500: R.E and S.M. Permission needed for S.U. 3. >500 < 1000: ECC recal, Rods Full in. 2nd time through Permission from R.E. and S.M. needed to continue S.U. |  | 
        |  | 
        
        | Term 
 
        | Boration Limit between PZR and RCS Loops is? |  | Definition 
 | 
        |  | 
        
        | Term 
 | Definition 
 
        | Start up Preps...   
RCS Pressure NOP
Tave 545-549
21-24 SG Levels 28-38% NR
ECC completed   |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | 
Place SGFP in ServiceSelect both SR to NR45Hold all plant evolutions that could effect criticallityEnergize Rod controlChem to Sample RCS and PZR boron  |  | 
        |  | 
        
        | Term 
 
        | What is Monitored during rod Withdrawl? |  | Definition 
 
        | IRPI Rod Bottom Lights Group Step Counters |  | 
        |  | 
        
        | Term 
 
        | Mode 2 is entered prior to pulling... |  | Definition 
 
        | Control Bank A is imminent. |  | 
        |  | 
        
        | Term 
 
        | Control Bank Hold Points... |  | Definition 
 
        | 
CBA fully WithdrawnRIL Position (58 steps on CBC)CBB Fully WithdrawnCBD at 50 or 8 Fold Rod position/ .125 ICRR/ 3 Doublings CBD Limited to < 50 step incr.R.E. may recommend 25 Step Incr10E-8 amps so subcritical multiplication and MTC and Dopler do not effect the NIS setpoint Data |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | SR/IR = 3-5 E5 amps IR/PR = 4-6 E -6 |  | 
        |  |