Term
| perf levels equate to _____ |
|
Definition
| probability of detection (4) |
|
|
Term
| What determines which RSR type receives priority for radar service. What are the levels? |
|
Definition
|
|
Term
| The _____ is the max interval between revisits desired for MTI rsrs. How are they selectable? |
|
Definition
| Revisit time, 0-300 in increments of 3 (4) |
|
|
Term
| The _____ allows the operator to input at what percentage of timeline capacity an alert will be generated |
|
Definition
|
|
Term
| Who does the SMO coordinate with during checkout? |
|
Definition
|
|
Term
| What are the dimensions of the RRCA for checkout? |
|
Definition
| +/- 30 degrees, 100KM to 200 km, confirm low res mti (15) |
|
|
Term
| T/F there should be less dots in the AC/AP that the RRCA because of high MTI resolution and revisit rates |
|
Definition
| F, there should be more dots in AC/APdue to higher res and revisit reates (16) |
|
|
Term
| What are you looking for when confirming MTI correlation? |
|
Definition
| Ensuring low res dots from RRCA/GRCA correlate in azimuth and range with the high res dots from AC/AP (16) |
|
|
Term
| What are the dimensions for an inner sar? Outer sar? |
|
Definition
|
|
Term
| In what swath do you shoot the FTI and the SAR mosaic? |
|
Definition
|
|
Term
| During checkout, what will confirm the functionality of the sar mosaic? |
|
Definition
| a readable set of 2 sars (AFTTP 3-1 JSTARS) (19) |
|
|
Term
| What TD is dual side control? |
|
Definition
|
|
Term
| To have the least effect on the timeline, it is recommended that perf level not be set above _____ and ______. |
|
Definition
| "N", never changed for the entire GRCA (23) |
|
|
Term
| How does an extreme crab angle affect SARS? |
|
Definition
| It can cause a smearing on them (24) |
|
|
Term
| T/F the RDR perf mon (TD 225) has no operator selectable or enterable fields |
|
Definition
|
|
Term
| What does it mean if the values in the ACG (automatic gain control) are static? |
|
Definition
| radar is broke and the ART must run diagnostics tests (27) |
|
|
Term
| The _____ is the difference between the aircraft velocity vector and the aircraft true heading |
|
Definition
|
|
Term
| _________ gives operators a "count" of system workload including number of rsrs being processed by type |
|
Definition
| TD 555 (system summary count) |
|
|
Term
| Radar checkout will be completed NLT ___ min post radar release |
|
Definition
|
|
Term
| Radar checkout will not be called fully operational until _____ check has been completed |
|
Definition
| high/med res sar check (34) |
|
|
Term
| When will SMOs confirm the accuracy of the radar? |
|
Definition
| Post AR and anytime the radar is down for more than 20 mins (34) |
|
|
Term
| SMO will pass radar operational time and accuracy in _____ to the MCC, SD and ART |
|
Definition
|
|
Term
| For Jammer coordination, what two things will the SMO do? |
|
Definition
| Input jammer point (TD 62) (36), send pointer with crew note (MCC/DMCC/SD/AI) with POS JMR in label and e-8C position at detection, azimuth, detection time and strength in the text (36) |
|
|
Term
| What is the first radar job approved for radar checkout? |
|
Definition
|
|
Term
| Who would the SMO notify if there is a radar problem? |
|
Definition
|
|
Term
| What TD is used to confirm the radar is set to operate and transmitters are configured conrrectly? |
|
Definition
|
|
Term
| To have the least effect on the timeline, it is recommended that perf level not be set above _____ and ______. |
|
Definition
| "N", never changed for the entire GRCA (23) |
|
|
Term
| How does an extreme crab angle affect SARS? |
|
Definition
| It can cause a smearing on them (24) |
|
|
Term
| T/F the RDR perf mon (TD 225) has no operator selectable or enterable fields |
|
Definition
|
|
Term
| What does it mean if the values in the ACG (automatic gain control) are static? |
|
Definition
| radar is broke and the ART must run diagnostics tests (27) |
|
|
Term
| The _____ is the difference between the aircraft velocity vector and the aircraft true heading |
|
Definition
|
|
Term
| _________ gives operators a "count" of system workload including number of rsrs being processed by type |
|
Definition
| TD 555 (system summary count) |
|
|
Term
| Radar checkout will be completed NLT ___ min post radar release |
|
Definition
|
|
Term
| Radar checkout will not be called fully operational until _____ check has been completed |
|
Definition
| high/med res sar check (34) |
|
|
Term
| When will SMOs confirm the accuracy of the radar? |
|
Definition
| Post AR and anytime the radar is down for more than 20 mins (34) |
|
|
Term
| SMO will pass radar operational time and accuracy in _____ to the MCC, SD and ART |
|
Definition
|
|
Term
| For Jammer coordination, what two things will the SMO do? |
|
Definition
| Input jammer point (TD 62) (36), send pointer with crew note (MCC/DMCC/SD/AI) with POS JMR in label and e-8C position at detection, azimuth, detection time and strength in the text (36) |
|
|
Term
| What is the first radar job approved for radar checkout? |
|
Definition
|
|
Term
| Who would the SMO notify if there is a radar problem? |
|
Definition
|
|
Term
| What TD is used to confirm the radar is set to operate and transmitters are configured conrrectly? |
|
Definition
|
|
Term
| Tgt classification can be selected for which areas? |
|
Definition
|
|
Term
| Where can one find the rge extend option? |
|
Definition
|
|
Term
| antenna side switching is only applicable to which RSR? What are the three options> |
|
Definition
| RRCA (11), auto, left, right |
|
|
Term
| When can initial sensor checkout occur? |
|
Definition
| Any time after the ART calls the purge complete and hands the radar to the SMO (12) |
|
|
Term
| What TD is used to confirm that the ART has placed the radar in operate and completed transmitter config |
|
Definition
| TD 433 Radar config calib (13) |
|
|
Term
In the RADAR config calib td 433, what must the following parameters be set to? 1. RDR STAT 2. XMT DEST 3. XMTR ENBL 4. XMTR CONFIG |
|
Definition
1. RDR STAT - ON 2. XMT DEST - ANTENNA 3. XMTR ENBL - ON/OFF 4. XMTR CONFIG - SELECT A XMTR (13) |
|
|
Term
| The CEP of the radar is defined in _________ |
|
Definition
|
|
Term
| When the decision to engage a tgt has been made, what is the preferred RSR used to provide faster updates? |
|
Definition
|
|
Term
| T/F, the rdr perf mon td 225 has no operator selectable or enterable fields. |
|
Definition
|
|
Term
| The data in nav perf monitoring td 226 that the smo is most interested in is ____ |
|
Definition
|
|