PMP Exam Prep - PMI NH
Scope Management
14
Other
Professional
09/09/2010

Additional Other Flashcards

 


 

Cards

Term
Name the 5 project scope management processes:
Definition
5.1 Collect Requirements
5.2 Define Scope
5.3 Create WBS
5.4 Verify Scope
5.5 Control Scope
Term
What is/are the output(s) of 'Collect Requirements'?
Definition
Requirements Documentation
Term
What is an input to 'Collect Requirements'?
Definition
Either 'Stakeholder Register' OR 'Project Charter'
Term
What is the WBS?
Definition
The Work Breakdown Structure is a graphical, hierarchical chart representing all the work to be performed on the project.
Term
What's the lowest level node on the WBS?
Definition
The work package
Term
What are the outputs of 'Collect Requirements'?
Definition
1) Requirements Documentation
2) Requirements Management Plan
3) Requirements Traceability Matrix
Term
Steve will be mananging a project to create and deliver a new type of toaster. While defining scope, which of the follow types of tools and techniques might he NOT use?
1) Expert Judgement
2) Variance Analysis
3) Product Analysis
4) Facilitated Workshops
Definition
2) Variance Analysis. Varience analysis is used during scope management.
Term
What term means 'A point-by-point review of the scope and project deliverables'?
Definition
Inspection. It is a tool used to verify scope.
Term
What is decomposition?
Definition
Decomposition is the subdivision of the project deliverables into smaller, more manageable components until the work and deliverables are defined to the work package level.
Term
What is the output of 'Create WBS' that accompanies the WBS itself?
Definition
The WBS dictionary.
Term
What is a tool and / or technique used in Control Scope?
Definition
Variance Analysis
Term
Which if the following is an output of 'Control Scope':
1) Scope Baseline
2) WBS Dictionary
3) Project Scope Statements
4) Accepted Deliverables
5) Work Performance Measurements
Definition
5) Work Performance Measurements. Items such as 'Accepted Deliverables' 'Project Document Updates' and 'Change Requests' are outputs of more than just control scope (see also Verify Scope, etc)
Term
What are project exclusions?
Definition
Documented items which specify what is outside of the project scope.
Term
Audits are a type of....
Definition
Inspection