| Term 
 
        | Name the 5 steps in the 5 step process of programming... by whom... |  | Definition 
 
        | Establishing goals, collecting and analyzing facts, uncovering and testing concepts, determining needs, and stating the problem.  by William Pena |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | In the uncovering concepts stage of programming, you develop abstract ideas that are solutions to the client's problems/goals w/o definign the physical means of doing so. |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | The physical solution to programmatic concepts. |  | 
        |  | 
        
        | Term 
 
        | Determining needs step of programming... |  | Definition 
 
        | balances the desires of the client against the available budget or establishes a budget.  Wants are separated from needs |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | there should be a minimum of 4 statements - one for form, function, economy, and time. |  | 
        |  | 
        
        | Term 
 
        | Form in relation to programming... |  | Definition 
 
        | existing conditions, the physical and psychological environment of the interior, and quality of construction. |  | 
        |  | 
        
        | Term 
 
        | The final programming document should at least include... |  | Definition 
 
        | goals, client requirements, spaces and sq. ft. |  | 
        |  | 
        
        | Term 
 
        | list 4 ways to gather information |  | Definition 
 
        | Interview, questionaire, observations, field survey |  | 
        |  | 
        
        | Term 
 
        | Of all the programming data, what are the two primary factors that determine the size and configuration of the interior space? |  | Definition 
 | 
        |  | 
        
        | Term 
 
        | how do you determine space requirements when not supplied by client? |  | Definition 
 
        | multiply how much one person's needed are by the total number of people.  or it can be based on equipment or specifice activity |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | total required area not including general circ., closets, electrical, walls, etc. |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | net area, or net assignable area |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | unassigned areas, circ, closets, etc. |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | net area plus secondary spaces |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | net area plus secondary spaces |  | 
        |  | 
        
        | Term 
 
        | "Efficiency of the Space" |  | Definition 
 
        | "net to gross ratio".  usually ranges from 60-80% |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | sq. ft. used for renting/leasing office/retail space.  inlcludes columns, and portion of exterior wall and partitions. |  | 
        |  | 
        
        | Term 
 
        | how do you measure rentable area when tenant only takes up a portion of a floor? |  | Definition 
 
        | inside of windows to inside of public corridor to centerline of shared walls.  it also includes a proportionate share of the corridor and rest rooms. |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | partition separating a tenant space from public spaces |  | 
        |  | 
        
        | Term 
 
        | Three types of adjacencies |  | Definition 
 
        | people (face to face contact or movement as apart of an activity), products (laudry chute), and info (intercom). |  | 
        |  | 
        
        | Term 
 
        | stacking diagram best illustrates what? |  | Definition 
 
        | shows the location of major spaces/dept. of a multi story building. |  | 
        |  | 
        
        | Term 
 
        | what is the problem analysis 
 what is the problem synthesis
 |  | Definition 
 | 
        |  | 
        
        | Term 
 
        | whose responsibility is it to determine how much info is required before desn can begin |  | Definition 
 | 
        |  |