 Describe the HWC trips and setpoints.
 |  | Definition 
 
        | -Main steam flow: <30%. -11 or 12 AE trip: AO-1085A/B closed.
 -Total H2 flow high: >58scfm.
 -Either RFP H2 flow high: >24scfm.
 -Low O2 pressure: <45psig.
 -Area H2 monitors: >1% H2.
 -O2 concentration at recombiner outlet: <5%.
 -Both recombiner outlet valves closed: AO-7557A/B shut.
 -Manual trip from control room or local at C-308.
 |  | 
        |  | 
        
        | Term 
 
        | HWC 
 Describe the HWC and RFP interlock.
 |  | Definition 
 
        | -If RFP secured or its recirc valve is open then that trains supply valve (CV-4152A/B) will shut. |  | 
        |  | 
        
        | Term 
 
        | HWC 
 Describe the gas compressor start signals.
 |  | Definition 
 
        | -H2 tank pressure at 110psig with the pump not operating and H2 receiver <2000psig. -H2 receiver <1800psig, with pump not running, and tank pressure >80psig.
 |  | 
        |  | 
        
        | Term 
 
        | HWC 
 Describe when the H2 pump starts.
 |  | Definition 
 
        | Cycles between 1200 to 1900 psig. |  | 
        |  | 
        
        | Term 
 
        | HWC 
 Describe the pump trips.
 |  | Definition 
 
        | -High receiver pressure (1900#). -Pipe line low temp: -250F.
 -Relief valve open: Tailpipe at -40F.
 -Low N2 purge or system pressure.
 |  | 
        |  | 
        
        | Term 
 
        | HWC 
 Describe O2 supply on loss of normal supply.
 |  | Definition 
 
        | -O2 bottles available. -That will ensure enough O2 available for complete H2 recombination of H2 remaining in system after trip.
 |  | 
        |  | 
        
        | Term 
 
        | HWC 
 Describe what happens on system trip.
 |  | Definition 
 
        | -Pretty much all valves close. -O2 supply flow to recombiners (primary and backup) take 12 minutes to close to ensure enough to recombine the H2.
 -All others close immediately.
 |  | 
        |  | 
        
        | Term 
 
        | HWC 
 Describe the O2 tank high pressure relief.
 |  | Definition 
 
        | -250psig. -Vented to atmosphere.
 |  | 
        |  | 
        
        | Term 
 
        | HWC 
 Describe any time delays in HWC.
 |  | Definition 
 
        | -Injection of O2 is delayed based on Rx power. -At 100% roughly 45 seconds to allow time for the H2 to show up at the O2 injection point.
 |  | 
        |  | 
        
        | Term 
 
        | HWC 
 Describe the steam flow interlock.
 |  | Definition 
 
        | H2 is interlocked to prevent injection when steam flow is <30%. |  | 
        |  | 
        
        | Term 
 
        | HWC 
 Describe rad levels and protection with HWC.
 |  | Definition 
 
        | -Rad levels in steam areas can increase by 3 to 5 times with an increase in H2 injection rate. -Can reduce HWC injection for work if will save 1 rem and have shift supervision permission.
 -Unplanned lowering takes Plant Manager permission.
 |  | 
        |  | 
        
        | Term 
 
        | HWC 
 Describe RWCU relationship with HWC.
 |  | Definition 
 
        | -Maximize RWCU flow 24 hours prior to HWC injection reduction and maintain until 72 hours after HWC restored to normal injection rate. |  | 
        |  |