Term
| how many active and spare transducers for primary and failsafe |
|
Definition
Primary: 2 active 1 spare Failsafe: 1 active and 2 spare |
|
|
Term
|
Definition
|
|
Term
|
Definition
| Hydraulic Storage Component |
|
|
Term
| 4 slippers on top of cross head are for what |
|
Definition
|
|
Term
| the baffle system in SWC is what kind |
|
Definition
|
|
Term
Pressure for 2 MEC transducers Pressure for 1 Accum transducers |
|
Definition
|
|
Term
|
Definition
9 3 Pri 3 Failsafe 2 MEC 1 Accumulator |
|
|
Term
|
Definition
|
|
Term
| What to do if there is no salt water flow |
|
Definition
| turn on salt water main valve |
|
|
Term
| what type of filter is cuno |
|
Definition
|
|
Term
|
Definition
| Anchors going back into Battery |
|
|
Term
| 2 things needed for tranferring |
|
Definition
|
|
Term
| 8 steps for transferring in |
|
Definition
1)stowage tank at 90-110 PSI 2)engine at 50 PSI 3) block retract valve open 4) open bypass valve 5) 2 pos 4 way valve open 6) open stowage tank engine valve 7) open needle valve 8) open high points |
|
|
Term
|
Definition
1) strip wire 2) double isolate 3) blow down to 150 4) 0 PSI 5) mark stowage tank level 6) open stowage tank valve to an engine 7) open 2 pos 4 way valve 8) block open retract valve 9) open bypass valve 10) open needle valve 11) open nozzle end air |
|
|
Term
|
Definition
|
|
Term
| R-6 below deck terminal are done when |
|
Definition
| 300 first then every 600 traps |
|
|
Term
| R-5 terminals are done when |
|
Definition
|
|
Term
| R-15 cdp swaps are done when |
|
Definition
|
|
Term
| r- 20 M zinc anodes are done when |
|
Definition
| monthly out at sea and prior to underway |
|
|
Term
| R-7 fluid filters are done when |
|
Definition
|
|
Term
| R-14 anchor slippers are done when |
|
Definition
|
|
Term
| when is R-10 crosshead slippers done |
|
Definition
|
|
Term
|
Definition
|
|
Term
| R-1 engine sheaves are done when |
|
Definition
|
|
Term
|
Definition
1 inch combo, ruler, 3/4 combo 3/8 combo special tool 9/16 combo 1/2 inch speed handle |
|
|
Term
| LVDT and what does it tell you |
|
Definition
Linear Variable Differential Transformer tells you position of stem |
|
|
Term
|
Definition
|
|
Term
| to trouble shoot during flight ops what needs to be offline |
|
Definition
| maintenance mode and cdp is offline |
|
|
Term
| what needs to be done during exercises |
|
Definition
| stroke anchors, sheave dampers and engine |
|
|
Term
| what kind of pull for wire pull- long pull or short pull |
|
Definition
|
|
Term
| how many pulls for a function |
|
Definition
|
|
Term
| function anchors pulls which side |
|
Definition
|
|
Term
| stroke anchors pulls which side |
|
Definition
|
|
Term
| how far is set screw backed out |
|
Definition
|
|
Term
| anchor terminals are how long |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
stem not seated retract valve is open |
|
|
Term
| 3 Retract Control Valve sensors are wat |
|
Definition
|
|
Term
|
Definition
|
|
Term
| High speed sheave size is what |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
15-20 seconds ideal : 17 sec |
|
|
Term
|
Definition
|
|
Term
| how many primary actuators and failsafes |
|
Definition
| 1 primary and 2 failsafes |
|
|
Term
| how long is purchase cable good for |
|
Definition
| 15 months or 2000 arrestments |
|
|
Term
|
Definition
| prevents stem from slamming into sleeve and chattering |
|
|
Term
| counter balance chamber does what |
|
Definition
| equalizes pressure above and below stem to keep it seated |
|
|
Term
|
Definition
every 300 to 900 traps then every 1000 to rereeve |
|
|
Term
|
Definition
|
|
Term
|
Definition
| advanced recovery control |
|
|
Term
| what do you use when there is no hydraulic fluid |
|
Definition
|
|
Term
| Primary and failsafe pressure |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
| 2 heavy hit aircraft and their weights |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
| seal for Battery Indicator rod |
|
|
Term
| temp stowage tank relieve valve relieves at what |
|
Definition
|
|
Term
| Clogged cartridge does this |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
| what do you want to break first- cdp or cable |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
| engine is designed for this |
|
Definition
| maximum stability with least amount of weight |
|
|
Term
|
Definition
|
|
Term
|
Definition
| accumulator to fluid cooler to fluid filter to retract valve to sleeve to MEC |
|
|
Term
| fluid flow upon arrestment |
|
Definition
Crosshead pushes ram into MEC MEC pushes fluid through 5 inch sleeve at 10K PSI out through outlet elbow thru accumulator also out 5 inch sleeve to operating end of anchors |
|
|
Term
Degrade mode 1 is what Degrade mode 2 is what degrade mode 3 is what |
|
Definition
Primary Engine GUI and Manual |
|
|
Term
Alt Bus Master is which degrade mode Engines set themselves is what |
|
Definition
Alt Bus is 1 Engine Gui is 2 |
|
|
Term
can you force ready a serious fault how with who's approval |
|
Definition
yes 1) Air Boss and Below Deck |
|
|
Term
can you recover with critical fault name all 7 crit faults |
|
Definition
|
|
Term
| how many distro blocks and relieves at what pressure |
|
Definition
7 Master- 3000 2 Primary; 2000 4 Secondary- 1800 |
|
|
Term
|
Definition
|
|
Term
| how many lube shots per second |
|
Definition
|
|
Term
|
Definition
|
|
Term
| lube drum contains how many lbs and how many shots |
|
Definition
|
|
Term
force battery color force fault color |
|
Definition
Battery: dim yellow fault dim red |
|
|
Term
how many slippers on anchors lower/ higher |
|
Definition
|
|
Term
how many slippers on floating piston fluid/air |
|
Definition
|
|
Term
|
Definition
|
|
Term
slippers on Crosshead how many on top |
|
Definition
|
|
Term
| these are held in by brass pins from retainer plate |
|
Definition
|
|
Term
| flapper valves in anchors |
|
Definition
|
|
Term
| service stroke of anchors |
|
Definition
|
|
Term
|
Definition
|
|
Term
| pressure equalizing valves starts this |
|
Definition
| initial movement of operating pressure |
|
|
Term
|
Definition
| cable tension overcomes hydraulic pressure |
|
|
Term
|
Definition
| hydraulic pressure overcomes cable tension |
|
|
Term
|
Definition
1) vent 2) start service X> arrest control> take control > OP mode > maint mode > Main Button > crov wire pull > start service X
3. close inlet valve 4. Deckedge says: "alright ening, stb side, portside stand clear, about to long pull and swap everyone says clear 5. movement and then roger movement Deckedge says breaking off and swapping 7. stop service X 8. reset cdp > eng detail , maint> reset cdp and position 9. open inlet 10. stand clear and retract |
|
|
Term
| this needs to be set before long pull |
|
Definition
|
|
Term
| crosshead stop max is what |
|
Definition
| Post and Pre OP is 1/2 inch |
|
|
Term
| when is two blocking done |
|
Definition
|
|
Term
barricade service stroke is two blocking is this |
|
Definition
service stroke is 160 two blocking is 168 |
|
|
Term
engine service stroke two blocking |
|
Definition
|
|
Term
| R-5 topside terminal is done when |
|
Definition
|
|
Term
| crosshead stop for newly and old re reeve is what |
|
Definition
1-7 for new 1- 6 1/2 for old |
|
|
Term
| purchase cable lays are what |
|
Definition
|
|
Term
|
Definition
1100 feet each total of 2200 |
|
|
Term
| retract control indicator controls this |
|
Definition
|
|
Term
| anchors are designed for this |
|
Definition
|
|
Term
| engine has how many kidneys and zinc anodes each |
|
Definition
| 2 kidneys and 3 zinc anodes each equalling 6 |
|
|
Term
|
Definition
|
|
Term
| what percent of tubes can be clogged |
|
Definition
|
|
Term
| SWC has how many U shaped tubes |
|
Definition
|
|
Term
max Engine Temp max Operating Temp Temp to turn on SWC |
|
Definition
|
|
Term
Engine has how many gallons MEC has how many gallons Accum has how many gallons SWC has how many gallons |
|
Definition
|
|
Term
Wobble tank holds how many gallons actual name for wobble tank |
|
Definition
6 1/2 Fluid Replenishment Tank |
|
|
Term
| wobble tank is used for what |
|
Definition
| remove or add small amounts of fluid to accumulator |
|
|
Term
| charge Aux Air to Accumulator |
|
Definition
| Close Vent Valve, Open Aux Air , Open Accumulator Air |
|
|
Term
|
Definition
| Close vent valve, open Ships Air, Open aux Air |
|
|
Term
| Aux Air Flask is charged to what PSI |
|
Definition
|
|
Term
| this provides necessary air pressure to charge accumulator |
|
Definition
|
|
Term
| accumulator safety head is located where on engine and what PSI will it blow |
|
Definition
|
|
Term
| CROV is also designed to do this` |
|
Definition
|
|
Term
|
Definition
meter flow of fluid from MEC to Accumulator
heavy bird = smaller openining |
|
|
Term
| operating and arrestment PSI of engine |
|
Definition
|
|
Term
|
Definition
Lay Up 1 is shut off Start Up 1 is start up |
|
|
Term
UPS stand for what what is it how long does it last |
|
Definition
Uninterrupted Power Supply Back Up for ARC 30 traps or 2 hours 30 min |
|
|
Term
Engine Pre Op Post Op Barricade Post Op |
|
Definition
|
|