Term
| Stakeholder Requirements Definition |
|
Definition
| Documents shortfalls, translate into requirements, gain full understanding, Needs into technical solutions |
|
|
Term
|
Definition
| What defines and refines system? |
|
|
Term
|
Definition
| What is the functional archietecture? |
|
|
Term
|
Definition
| What provides defintion of the system functional baseline? |
|
|
Term
|
Definition
| THe outcome of functional archecture and is the development of lower tier functional and performance requirements that need to be allocated to the systems physical archiecture? |
|
|
Term
|
Definition
| Functional Baseline = Inventory of Functions |
|
|
Term
|
Definition
| This is when the final design is selected. |
|
|
Term
|
Definition
| Up and down traceability of requirements across functiaonl allocated and product baselines. |
|
|
Term
|
Definition
| Fabricates the lowest element in the system for integration, verification, validation. |
|
|
Term
|
Definition
| Process of incorporating lower level system elements into higher level system elementsin the physical architecture. |
|
|
Term
|
Definition
| What is Analysis, examiniation, demonstration and testing |
|
|
Term
|
Definition
| What phase is verification done? |
|
|
Term
|
Definition
| What are prototypes, mock ups, M&S of systems, M&S of environments |
|
|
Term
|
Definition
| Moves the system element to the next developmental stage or for the end of the product to the user |
|
|
Term
| Spectrum Certification Stage 1 |
|
Definition
|
|
Term
| Spectrum Certification Stage 2 |
|
Definition
| What stage is Experimental |
|
|
Term
| Spectrum Certification Stage 3 |
|
Definition
| What stage is Developmental / Test |
|
|
Term
| Spectrum Certification Stage 4 |
|
Definition
| What stage is Operational |
|
|
Term
|
Definition
| Request for Equipment Frequency Allocation is what form? |
|
|
Term
|
Definition
| Mechanism to allow minor changes to an existing frequency allocation in lieu of generating a new request |
|
|
Term
|
Definition
| Must be specific and demonstrated during the phase |
|
|
Term
|
Definition
| Can be considered program specifc or tailored |
|
|
Term
|
Definition
| Are not part of the acq baseline |
|
|
Term
|
Definition
| Does not cause program baseline deviations |
|
|
Term
|
Definition
| Applicable to all programs |
|
|
Term
|
Definition
| Describes what accomplishments are necessary to obtain a successful decision at each major milestone |
|
|
Term
|
Definition
| Essential and integral to successful program managment, development, and field of global capabilities |
|
|
Term
|
Definition
| Determinitaion by statute by M/S |
|
|
Term
Decision Analysis Technical Planning Technical Assessment Requirements Management Risk Management Configuration Management Data Management Interface Mangement |
|
Definition
| What are the Technical Management Process |
|
|
Term
|
Definition
| Provides the best basis for evaluation and selection of technical alternatives |
|
|
Term
|
Definition
| Ensures proper application of SE processes throughout the system lifecycle |
|
|
Term
|
Definition
| Measures technical progress and the effectivenes of plans and rqmts |
|
|
Term
| Technical Performance Measurement |
|
Definition
| Forecasts Values of essential performance Parameters |
|
|
Term
| Technical Performance Measurement |
|
Definition
| Measures values achieved by current design |
|
|
Term
| Technical Performance Measurement |
|
Definition
| Determiens impact of differenes on ssytem effectiveness |
|
|
Term
|
Definition
| Plans and conducts reviews |
|
|
Term
| Technical Performance Measurement |
|
Definition
|
|
Term
|
Definition
| Provides traceability of systems and subsystems requirements ultimately back to user-defined capabilities and needs |
|
|
Term
|
Definition
| Addresses potential risks for deviation from the program objectives over the lifecycle. |
|
|
Term
|
Definition
| (Critical element) establishment and maintenance of the consistency of a product's attributes with its requirements and configuration information |
|
|
Term
|
Definition
| (Critical Element)access and retrival of the right data. Data to support the system throughout life cycle |
|
|
Term
|
Definition
| practice and proceduress to ensure proper interface definitions and documentation and compliance throughout the systems life cycle |
|
|
Term
|
Definition
| Among the most common sources of failure |
|
|
Term
|
Definition
| Govt determines all PSP rqmts, procure elements, measures. Materiel availabilty performance & adjusts elements |
|
|
Term
|
Definition
|
|
Term
|
Definition
Provider responsible for some Materiel availability elements or Mean Down TIme but not configuration. Govt determines all PSP reqmts, procure elements, measures Materiel Availabilty performance & adjusts elements |
|
|
Term
|
Definition
| Logisitc Element Peformance |
|
|
Term
|
Definition
| Provider responsible for Materiel availabilty by managing configuration (incl reliabilty) Mean Down Time and Ownership costs. Gov determines weapon system quanity. Govt determines Materiel Availabity reqmts and measures performance. |
|
|
Term
|
Definition
|
|
Term
|
Definition
| Provider responsible for providing the operational cability includng determine weapon system quanity. Govt measures performance per interval (e.g streaming hours, flying hours, miles, launches, etc per month). |
|
|
Term
|
Definition
|
|
Term
Project Integrity Construction Integrity Product Stability and Integrity |
|
Definition
| What are part of the Software Best Practices (3 elements) |
|
|
Term
|
Definition
What is the a part of for SW best practices: Adopt a continuous program risk management Estimate costs and schedule empirically Use metrics to manage Track EVM Track defects against quality targets Treat People as the most important resource |
|
|
Term
|
Definition
What is the a part of for SW best practices? Adopt a life cycele configuration managment Manage and trace requirements Use system based software design Ensure data and database interoperabilty define and control interfaces Design twice code once Assess reuse risks and Costs |
|
|
Term
| Product Stability and Integrity |
|
Definition
What are these SW best practices apart of? Inspect requirements and design Manage testing as a ocntinuous process Compile and smoke test frequently |
|
|
Term
|
Definition
| What serves as the basis for implementing effective performance based managment of software intensive projects |
|
|
Term
| System Functional Review SFR |
|
Definition
| What review determines the System Functional Baseline |
|
|
Term
| Verification / Validation |
|
Definition
| Ensures that the solution meets requirements (Specs, CDD, CPD) |
|
|
Term
Analysis Simulations Inspections Tests |
|
Definition
| What is verification accomplished through? |
|
|
Term
|
Definition
| Stakeholder Requirements Defintion <---> Validation |
|
|
Term
|
Definition
| Requirements Analysis <---> Verfication |
|
|
Term
| Configuration Item Expectations |
|
Definition
| Arch. Design <--->Integration |
|
|
Term
|
Definition
Analyze functions Decompose higher level functions to lower level functions Allocate performance requirements to the functions |
|
|
Term
|
Definition
Defines the physical architecture Each part must perform one function SOme parts may perform more than one function |
|
|
Term
|
Definition
|
|
Term
|
Definition
| Addresses Technical effort required and the techncial maturation of the system throughout the program |
|
|
Term
|
Definition
| What can influence derived requirements? |
|
|
Term
|
Definition
| Mandated tool and driven by Technical Planning |
|
|
Term
| PDR Non-Major Acat Programs |
|
Definition
| Can be during Technology Demonstration Phase (if part of the TDS) or MS B, early in EMD Phase |
|
|
Term
|
Definition
| PDR, PDR Report, Post PDR Assessemnt - must be done prior to MS B |
|
|
Term
|
Definition
|
|
Term
|
Definition
| Developing the supporting documentation for the system element, manuals, operations, maint. installation, packaging, handling storage |
|
|
Term
|
Definition
Verfication and validation for Manufacturing / Coding Procurement Re use |
|
|
Term
|
Definition
| The strategy and planning may impose constraints on the design solution as well as implementation process |
|
|
Term
|
Definition
Analysis Examination Demonstration Testing |
|
|
Term
|
Definition
Prototypes Mock ups M&S system M&S environment are all a part of what? |
|
|