| Term 
 
        | What are the (5) Stages of planning. |  | Definition 
 
        | Ground Tactical plan, Landing Plan, Air Movement Plan, Loadin Plan, and Staging Plan. |  | 
        |  | 
        
        | Term 
 
        | Considerations of the Ground Tactical plan. |  | Definition 
 
        | -Developed first, Basis for othr plans, specifies acions in the obj area which accomplish the misson, constructed/ conducted with all elemets of a typical infantry attack except it capitalizes on speed/ mobility of heliborne assault. |  | 
        |  | 
        
        | Term 
 
        | Considerations of the Landing Plan. |  | Definition 
 
        | Smallest tactical unit to land should provide a degree of combat power to secure the LZ for follow on forces, Forces landing must be prepared to fight in any direction, # of Helo's needed for insert (size of force, # helo's avail, # Helo's fit in LZ, force required to accomp initial obj w/out delay, available space/time), A/C should not be in range of Enemy IDF, all members need to understand their mission immediately upon exiting the A/C. |  | 
        |  | 
        
        | Term 
 
        | Preparation of Landing Plan. |  | Definition 
 
        | Preplanned targets for each phase of the operation, request and plan for fire support assets, LZ selection, Heli-team organization (unit inegrity, tactical spread loading, Heli-team leader). |  | 
        |  | 
        
        | Term 
 
        | Considerations of the Air Movement Plan. |  | Definition 
 
        | Based on Ground Tactical Plan and Landing Plan, specifies when and how troops/ equip/supplies will be transported from PZ to LZ, and prvides info on ingress/egress routes, air control points, A/C speeds altitudes, and formations. |  | 
        |  | 
        
        | Term 
 
        | Considerations of the Loading Plan. |  | Definition 
 
        | Establish, organize, and control activities in the PZ/ aboard ship, establish priority of loading units, #/type of A/C supporting. |  | 
        |  | 
        
        | Term 
 
        | Helicopter loading Capacity for CH-46, CH-53 D/E, MV-22. |  | Definition 
 
        | CH-46 (12) Combat loaded troops, CH-53 D/E (24) Combat loaded troops, MV-22(24) Combat loaded troops. |  | 
        |  | 
        
        | Term 
 
        | Considerations of the Staging Plan. |  | Definition 
 
        | Based on the Loading Plan, prescribes the arrival time of ground units at the PZ in the proper order for movement. |  | 
        |  | 
        
        | Term 
 
        | (16) Lines of the LZ brief. |  | Definition 
 
        | Mission number, Location, Unit Call Sign, Freq, LZ Marking, Wind Dir/ Velocity, Elevation/Size, Obstacles, Friendly pos Dir/Dis, Enemy pos Dir/Dis, Last Fire Time/Type, Last Fire Dir/Dis, Clearance to fire Dir/Dis, Approach/Retirement, Personnel/Equip, Other. |  | 
        |  | 
        
        | Term 
 
        | Size LZ needed for UH-1, CH-46, CH-53, MV-22 with Obstacles 5-40 ft, 40-80 ft, 80+ ft. |  | Definition 
 
        | LZ diameters in feet with Obstacles 5-40 ft, 40-80 ft, 80+ ft: UH-1 100, 150, 200. CH-46, CH-53, and MV-22 175, 250, 350.
 |  | 
        |  |