Term
| Define System development |
|
Definition
| Process of modifying a portion or all of an IS. |
|
|
Term
| What are the four stages of system development |
|
Definition
| Planning and investigating, analyzing, designing, implementation followup maintenance. |
|
|
Term
| What does planning/investigating mean |
|
Definition
|
|
Term
|
Definition
| looking at our strengths and weaknesses |
|
|
Term
|
Definition
| Design plans to minimize our weaknesses |
|
|
Term
| Define Implementation, Followup, maintenance |
|
Definition
| Gather new resources for plan, hire new employees, followup studies, fix little flaws in system. |
|
|
Term
|
Definition
| subsystems in the IS that need extra development. Used to find areas that need improvement now or in the future. |
|
|
Term
|
Definition
| A It specialist, middle-level manager, operational supervisor, accountant, auditor. |
|
|
Term
| Define Steering committee |
|
Definition
| Group of upper-level management, critical to have backing of management when revising or making a new plan. |
|
|
Term
| Why would you investigate current systems? |
|
Definition
| Investigate current needs or problems. |
|
|
Term
| What are the four major systems in system analysis? |
|
Definition
1. Understanding the system goals 2. System surveys 3. Data analysis 4. Evaluating system feasability |
|
|
Term
| Understanding the general system goals: |
|
Definition
| Cost awareness, outputs make good decisions for management, design a system, Flexibility to changing information needs. |
|
|
Term
| What should AIS provide to top management system goals? |
|
Definition
| Long-range budget planning data, valuable control information about corporate operations, short-range operating performance. |
|
|
Term
| What should AIS provide to top management system goals? |
|
Definition
| Long-range budget planning data, valuable control information about corporate operations, short-range operating performance. |
|
|
Term
| What are the operations managers system goals? |
|
Definition
|
|
Term
| What is the objective of a system survey? |
|
Definition
| Retain systems strengths while eliminating weakenesses |
|
|
Term
| What is an example of data analysis? |
|
Definition
| Analysis of employee productivity. |
|
|
Term
|
Definition
| The amount of productive work that can be performed within a certain time. |
|
|
Term
| Define work distribution analysis: |
|
Definition
| focuses on a particular job and looks at efficiency rather than an employee |
|
|
Term
|
Definition
| Can the planned system be created with todays technology |
|
|
Term
|
Definition
| Does the organization have access to people that can design, implement and operate the system. |
|
|
Term
| Define Schedule feasability |
|
Definition
| How long will it take for a system to become operational. |
|
|
Term
| Define Economic feasibility: |
|
Definition
| The benefits cover the costs. |
|
|
Term
| Which way should the design team work (outputs to inputs, or inputs to outputs?) |
|
Definition
|
|
Term
| Objective of output design? |
|
Definition
| determine nature, format, content, and timing of printed reports. |
|
|
Term
| What are some types of reports and their meanings? |
|
Definition
Scheduled reports: specified content and format on regular basis Special-purposes analysis reports: no specified content or format and are not prepared on a regular basis. |
|
|
Term
| Define triggered exception reports: |
|
Definition
| Specified content and format, prepared only in response to abnormal conditions. |
|
|
Term
|
Definition
| Hvae a pre-specified content but are prepared only on request. |
|
|
Term
| What are two designing system inputs? |
|
Definition
|
|
Term
|
Definition
| Using paper to design inputs. |
|
|
Term
|
Definition
|
|
Term
| What should designers do should they add controls after system is done or earlier?... also is it a build-in or build on control they want? |
|
Definition
| During the whole process..... build in rather than build-on. |
|
|
Term
|
Definition
| Simplified working model, to reduce project risk and costs. |
|
|
Term
|
Definition
| Simplified working model, to reduce project risk and costs. |
|
|
Term
| What are the steps in prototyping? |
|
Definition
1. Identify Is requirements 2. Create the prototype 3. test and revise prototype 4. signoff on approved prototype |
|
|
Term
| When is prototyping useful? |
|
Definition
| When the end users do not know their information needs. |
|
|
Term
| What should the system design be |
|
Definition
| It should be in the form of a proposal. |
|
|
Term
| Define system implementation |
|
Definition
| Getting the HW and SW installed and getting AIS running |
|
|
Term
|
Definition
| Going from old to new system. |
|
|
Term
| What is a typical problem through conversion: |
|
Definition
| Converting all the old data. |
|
|
Term
| What is a typical problem through conversion: |
|
Definition
| Converting all the old data. |
|
|
Term
|
Definition
| Going from old to new system. |
|
|
Term
|
Definition
| Going from old to new system. |
|
|
Term
| What is a typical problem through conversion: |
|
Definition
| Converting all the old data. |
|
|
Term
| Define direct conversion: |
|
Definition
| immediately terminates the old AIS and starts with new. |
|
|
Term
| Define Parallel conversion |
|
Definition
| Operates on the old and new for a period of time and then to the new only |
|
|
Term
|
Definition
| Gradually replaces elements of old with new. |
|
|
Term
|
Definition
| Implements only in one part of organization at a time. |
|
|
Term
|
Definition
| Depics major activities, shows actual and planned times. chart treats each activity as if it were its own. |
|
|