Term
| What is the most important concept a Sensor mgr needs to master? |
|
Definition
|
|
Term
| Who typically determines revisit rate for a GRCA? |
|
Definition
| The Army typically stipulates the revisit rate (7) |
|
|
Term
|
Definition
| The requirement of the radar to revisit all approved RSRs within a specified time(7) |
|
|
Term
| Define timeline objective |
|
Definition
| Current RSRs must be serviced by their specified revisit time(7) |
|
|
Term
| What effect does a single shot RSR's impact on the timeline? |
|
Definition
| The offset the timeline by their service times (8,19) |
|
|
Term
| Changes to TD 404 are ___ and do/ do not affect previously approved RSRs. |
|
Definition
| global and immediate, do not(21) |
|
|
Term
| Submitted RSRs using other than the parameters set in TD 404 will do what to the timeline? |
|
Definition
| It redefines the timeline (21) |
|
|
Term
| The _____ console assignment provides the means for the operator to effectively manage the radar timeline |
|
Definition
|
|
Term
In regards to RSR status, what do the following terms mean? 1. Approved 2. Current 3. Active 4. Suspended 5. Complete |
|
Definition
1. Approved - RSR has been approved 2. Current - w/n the rdr field of view 3. Active - RSR is being serviced (shot) 4. Suspended - SAR/FTI suspended from being serviced by radar 5. Complete - RSR has been shot |
|
|
Term
| What happens to timeline use as the number of RSRs increase? |
|
Definition
|
|
Term
| What does it mean when a timeline is busted? |
|
Definition
| The GRCA revisit exceeds the requirement established by the army or our primary customer |
|
|
Term
| What should the revisit rate for a GRCA be? |
|
Definition
|
|
Term
| In order to minimize the TL at CAP alert, what two things should the SAWO do? What does this do to the alerts? |
|
Definition
| Set "0" as the revisit rate for the GRCA and 999 in the threshold field of the RSR FCTN PARAM TD (9)/ renders the alert meaningless |
|
|
Term
| The ____ determines which RSR receives priority for radar service. What range is it selectable from? |
|
Definition
| IP (interrupt priority), 1-16 (11) |
|
|
Term
| The _____ specifies the minimum time that a RSR is scheduled for service by the radar |
|
Definition
|
|
Term
| Revisit rates are selectable from _____ to ____, in ____ increments |
|
Definition
|
|
Term
| T/F Interrupt priority and revisit rates can be set globally in TD 404, however, the individual RSR setting can override the TD 404 setting |
|
Definition
|
|
Term
| Perf levels are selectable from ____. what is the default? |
|
Definition
|
|
Term
| Increasing the perf level allows for an increased _______. What is a consequence? |
|
Definition
| Probability of detection (12), timeline use increases |
|
|
Term
| What happens to the timeline when tgt classification is enabled? |
|
Definition
|
|
Term
What are the interrupt priorities for the following RSRs? 1. AC 2. AP 3. SS 4. WAS 5. SAR 6. FTI 7. SATC |
|
Definition
1. AC - 4 2. AP - 6 3. SS - 8 4. WAS - 10 5. SAR -2 6. FTI -2 7. SATC -4 |
|
|
Term
What are the revisit rates for the following? 1. AC 2. AP 3. SS 4. WAS 5. SAR 6. FTI 7. SATC |
|
Definition
1. AC - 12 2. AP -21 3. SS -30 4. WAS - 0 5. SAR - 6. FTI - 7. SATC - |
|
|
Term
| RSRs move from the ___ to the ___ when they are approved. When they are complete, they move to the ____ |
|
Definition
| RSR que-Approved RSR list, sar/single scan list td |
|
|
Term
| The "D" in the RSR que stands for ____ |
|
Definition
|
|
Term
| What is the main defense against an unmanagble timeline? |
|
Definition
|
|
Term
| The APPV RSR list t/d is accessible through: |
|
Definition
| The radar mgmt menu bar and the proc rsr pushbutton on the MSN common select (31) |
|
|
Term
| What does FAC NUM (APPV RSR list) mean? |
|
Definition
| Facility number of the platform generating station; cgs or jtids platform (37) |
|
|
Term
| In regards to dual side ops, the _______ option is required for max effectiveness |
|
Definition
|
|
Term
| What are the min and max time defaults for time on side (dual side ctrl 402) |
|
Definition
|
|
Term
| In dual side ctrl, what is the worst place to set the pri side ref pt? Best place? |
|
Definition
| In front of the nose/ off boresight (43) |
|
|
Term
| The Curr column (dual side ctrl 402) displays _____. |
|
Definition
| time in secs that has elapsed since the radar began servicing RSRs on the current side and operates like a counter (45) |
|
|
Term
| (dual side ctrl 402) when will the DSS begin to evaluate switching to the opposite side |
|
Definition
| When the display in the curr column has surpassed the min time on side value (45) |
|
|
Term
| (dual side ctrl 402) The dss will switch sides for what two conditions? |
|
Definition
1. All the rsrs have been serviced at least once since servicing began on that side 2. When the value in the Curr column exceeds the max time on side value (45) |
|
|
Term
| The ______ provides the means to APPROVE or disapprove rsrs |
|
Definition
|
|
Term
| T/F- the approved rsr list td 2 enables deleting an approved job without going back to the RSR que |
|
Definition
|
|
Term
| The _____ allows for global rsr adaptation parameter modifications |
|
Definition
| RSR functional parameters TD 404 (4) |
|
|
Term
What are the TD numbers for the following td names: 1. RSR que 2. RSR list 3. RSR Functional parameters 4. Dual side ctrl |
|
Definition
1. RSR que- 401 2. RSR list- TD2 3. RSR Functional parameters- 404 4. Dual side ctrl- 402 5. |
|
|
Term
| T/F the radar will process any portion of an AP or AC but a GRCA must be completely in the field of view |
|
Definition
| F, AP/AC must be completely be in radar field of view (5) |
|
|
Term
| T/F effectinve timieline mgmt is critical for mission operations |
|
Definition
|
|
Term
| What happens when radar updates become infrequent? |
|
Definition
| Possibly renders the info useless (6) |
|
|
Term
| The % timeline alert threshold is selectable through the ______ |
|
Definition
| RSR functional parameters TD 404 (9) |
|
|
Term
| Which TD can be used to set non-global parameters for RSRs? |
|
Definition
|
|
Term
| What three things will vary the service time for target classification? |
|
Definition
| RSR size, resolution and quantitity (13) |
|
|
Term
| Target classification, when enabled will ______ RSR service times. This change in service time is used to determine the difference between _____ |
|
Definition
| increase; tracked and wheeled (13) |
|
|
Term
| T/F smaller RSRs will take less time to service than large rsrs. |
|
Definition
|
|
Term
| Changes to the parameters in the RSR functional parameters td (404) are ________ in nature. |
|
Definition
| global and immediate (17) |
|
|
Term
| On the functional parameters TD 404, the ____ tab defines initial timeline objective for the system |
|
Definition
|
|
Term
| Changes in TD 404 pertaining to (3 things) are very important for effective timeline mgmt. |
|
Definition
| Revisit interval, perf level, tgt classification (21) |
|
|
Term
| What column in the approved rsr list td 404 will allow one to ensure revisits are w/n standards? |
|
Definition
| RI- Revisit interval (35) |
|
|
Term
| What does the SRM do? What percentage of the timeline is it allocated? |
|
Definition
| Controls sensor resources for the maintenance of priority tracks; 20% (51) |
|
|