| Term 
 
        | 500KV Elecetrical System Purpose |  | Definition 
 
        | a. Receive 500 KV generated power via two banks of 3 ,single phase step up Transformers and transmit this power over 3 transmission lines. b. Provide offsite power to each units auxiliaries and to each units protection system and safety systems during abnormal and accident conditions. via: 13KV-4KV step down Station Power Transformers.   |  | 
        |  | 
        
        | Term 
 
        | 3 transmission lines connected to te 500 KV Ring bus |  | Definition 
 
        | 1. Hopecreek 2. New Freedom 3. Orchard(Dean) |  | 
        |  | 
        
        | Term 
 
        | How many bus sections are in the 500 KV system and how are they connected? |  | Definition 
 
        | 7 Bus sections: Bus sections 1 and 2 connect the other sections in a ring bus formation and connect the 1,2,3,4 SPT to the 500KV system. The SPT step down the 500 to 13 KV. |  | 
        |  | 
        
        | Term 
 
        | How many Breakers are in the 500 KV ring bus and what sections do they connect? |  | Definition 
 
        | 8   2-6, 2-8, 2-10   5-6, 9-10   1-5, 1-8, 1-9 |  | 
        |  | 
        
        | Term 
 
        | Which Breakers can be controled by the dispatcher remotely? |  | Definition 
 
        | The Breakers that isolate the outgoing and incoming Transmission Lines: 2-10, 2-8, 2-6 5-6, 1-8, 9-10 |  | 
        |  | 
        
        | Term 
 
        | Breaker position during full operation?   Single Unit operation?   Single unit operation with drops disconnected? |  | Definition 
 
        | All 500KV breakers closed   Output breakers open all others closed   All 500KV breakers closed         |  | 
        |  | 
        
        | Term 
 
        | Describe "Breaker and a half Scheme" |  | Definition 
 
        | 3 Breakers protecting 2 Lines or Sections |  | 
        |  | 
        
        | Term 
 
        | Name the output breakers for unit 1 MPT and Unit 2 MPT |  | Definition 
 
        | Unit 1: 5-6, 1-5   Unit 2: 9-10, 1-9 |  | 
        |  | 
        
        | Term 
 
        | 500 KV Breaker description |  | Definition 
 
        | SF6 Arc suppressing gas filled with 2 interupting heads |  | 
        |  | 
        
        | Term 
 
        | Name 4 circuit switchers and their operation |  | Definition 
 
        | 1T60 2T60 3T60 4T60   Remotely and automatically isolates high side of the SPT upon a low side bus ground fault.   Circuit switchers have both cicuit interupters and automatic diconnect features. |  | 
        |  | 
        
        | Term 
 
        | 500 KV related Tech Specs |  | Definition 
 
        | 3.8.1.1 AC Sources- Operating: LCO: a. 2 independent sources of OSP b. 3 seperate EDG with seperate day tanks min of 130g of fuel and a common FOST min volume of 23000g and 2 FTPs 3.8.1.2 AC Sources -Shutdown: LCO: 1 source of OSP and 2 EDG and 1 FTP |  | 
        |  |