| Term 
 
        | 4KV 
 Describe the windings on 2R and 1R.
 |  | Definition 
 
        | -X windings supplies buses 11 and 12. -Y windings supplies buses 13 and 14.
 |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe power supply to bus 17 & 18.
 |  | Definition 
 
        | -Bus 17 normally from 1ARS transformer. -Bus 18 normally from #6 transformer.
 |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe what powers buses 15 & 16.
 |  | Definition 
 
        | -15 normally powered from 13 bus. -Alternate supply from 1AR and 11 EDG.
 -16 normally powered from 14 bus.
 -Alternate supply from 1AR and 12 EDG.
 |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe bus control power.
 |  | Definition 
 
        | -11,13,15 buses are div I (11 battery). -12,14,16 are div II (12 battery).
 -15,16 can be cross-connected.
 -If 17 bus is energized then supplies both 17 and 18 bus control power.
 -Loss of 17 bus transfers to 18 bus.
 -ABT is normal seeking.
 |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | -Normal source for 4KV. -Powered from 2RS.
 -Control power is 480VAC (MCC-131/121 normal seeking).
 -Sudden pressure rise in oil tank causes lockout and alarm
 |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | -Backup power to buses 11-16. -Fan cooled based on amps powered from MCC-121.
 |  | 
        |  | 
        
        | Term 
 | Definition 
 
        | -Normal power from 10 bank. -Alternate feed from 1ARS.
 |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe transformers 7 and 8.
 |  | Definition 
 
        | -Powers discharge structure buses. -Interlock prevents both breakers being closed based on B disconnects.
 |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe the automatic station power transfer.
 |  | Definition 
 
        | -Break before make. -Transfers from 2R to 1R but not back.
 -No time delays.
 -Caused by anything that secures power to 2R.
 -First trips both recirc pump drive motors and both CW pump motor breakers.
 -If a recirc MG drive motor breaker fails to trip open, the 1R source breaker to associated bus (11 or 12) will not close.
 -Then 2R breakers open then 1R breakers close.
 -Buses 11,13,&14 auto transfer to 1R when bus voltage is <25% normal voltage.
 -Bus 12 does not normally transfer, but will transfer if bus 11 is locked out or #11RFP breaker is open and 12 bus voltage < 25% rated.
 |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe the loss of normal supply essential bus transfer.
 |  | Definition 
 
        | -If both source breakers to a given bus open for > 5 seconds then the associated tie breaker trips and loss of voltage initiates. |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe loss of essential bus voltage transfer.
 |  | Definition 
 
        | -Setpoint is 2625volts. -4 sensing relays (1 out of 2 twice).
 -Loss of voltage sensed then:
 -Degraded bus voltage is disabled.
 -5 second time delay and 10 second time delay initiated.
 -Associated EDG starts immediately.
 -After 5 seconds the bus tie breaker trips and transfer to 1AR.
 -If 10 seconds pass w/out voltage then tie breaker trips and 1AR trips and transfer to associated EDG.
 |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe the degraded essential bus voltage transfer.
 |  | Definition 
 
        | -3 sensing relays (2 of 3). -Setpoint 3920volts.
 -Sense for 9 seconds then tie breaker trips and transfer to 1AR and associated EDG starts.
 -If now that on 1AR and still sees degraded voltage for 5 more seconds then 1AR breaker trips and transfer to the EDG.
 |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe load shed for the essential bus transfer.
 |  | Definition 
 
        | -Shed of all essential bus loads except the associated 480VAC load center. -Shed of all non essential MCCs.
 -Trip of associated tie breaker.
 |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe in detail the load shed on essential bus transfer.
 |  | Definition 
 
        | Division I/II -11,13/12,14 RHR pumps.
 -11/12 core spray pumps.
 -11/12 CRD pumps.
 -11,13/12,14 RHRSW pumps.
 -MCC-131,132/141,142B.
 -LC-103 tie to 104/ LC-104 tie to 103.
 -Turbine aux oil pump (div I)
 |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe normal ECCS load shedding.
 |  | Definition 
 
        | If 2R or 1R supplying: -Drywell cooling recirc fans.
 -RHRSW pumps.
 |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe ECCS load shedding if on 1AR or EDG.
 |  | Definition 
 
        | -11/12 CRD pump. -11,13/12,14 RHRSW pumps.
 -VRF-1,3/2,4 drywell cooling fans.
 -11/12 fuel pool cooling pumps.
 -11/12 RBCCW pumps.
 -12 service water pump (div II).
 |  | 
        |  | 
        
        | Term 
 
        | 4KV 
 Describe ASDS transfer load shedding.
 |  | Definition 
 
        | -12,14 RHR pumps. -12,14 RHRSW pumps.
 -12 CRD pump.
 -12 core spray pump.
 -MCC-141,142B.
 -LC-104 tie to LC-103.
 (Same as Div II ECCS shed).
 |  | 
        |  |